PMC Forums  

Go Back   PMC Forums > Industrial Engineering > Work Measurement
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Work Measurement Work Standards, Work Sampling, Time Study, Motion Study, Work Study, Predetermined Time Standards, MOST, MTM, MODAPTS, Stop Watch Study

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 01-28-2008, 01:38 PM
catjack76 catjack76 is offline
Member
 
Join Date: Jan 2008
Posts: 1
Default Starting performance measurement system

Hello

I work on a medical supply company me department process claims.

There is no type of performance measurement in the department.

I am in charge of creating some kind of performance measurement.

I think timing each activity , creating an average of time expended per activity would be the best way to approach.

My objectives are:

- To find out the capacity of the department as a whole and every sub-department.
- To create a management tool that would assist the department manager when assessing the need for a new hire.
- Create data that will help us in the future to identify bottle necks and fix them.

I have no experience in engineering and I would like to know if this is the best approach , please note that I am not interested in improving performance yet.


Thanks

Carlos
Reply With Quote
  #2 (permalink)  
Old 01-30-2008, 08:24 AM
kpeacock kpeacock is offline
Member
 
Join Date: Jul 2007
Posts: 3
Default

Timing is definitely going to play a role in the development of performance measures. First though define a standard procedure for everyone to follow. It does you no good in determining your capacity if each worker does the process different thus moving faster or slower then originally expected. Once the best practice is determined, timing of the process will start. There are several different types of methods for determining time. Some would use a stopwatch, others can use pre-determined time systems ie. MOST, MODAPTS, MTM, etc. These pre-determined time systems were developed in order to ensure accuracy, and also allow for easier breakdown of the operation into parts.

Once standardized timing is developed for the processes then you can begin to determine the capacity of the system. Capacity can be easily broken down in the departments as well as have the collective sum for the entire facility. You can then begin to clearly define performance measures. It is important to know what the capacity goals are for the company, ie. a claim should be closed within 14 days. Those goals will then help in the development of performance measures.

Also the other benefit of standardized work measures is to better understand employee utilization. Once you begin to understand what kind of utilization is occurring, you can begin to forecast the number of employees that are needed to meet the capacity rates or goals. This will help the management staff know what kind of employee levels they may need throughout the year.

Sorry for the lengthy answer but there is a lot that can be covered when it comes to standardizing work and developing performance measures.
Reply With Quote
  #3 (permalink)  
Old 02-29-2008, 03:57 AM
abhijit abhijit is offline
Member
 
Join Date: Feb 2008
Posts: 6
Default

i agree with kpeacock. in addition to that please find out the contingencies and unavoidable non value added times. i dont have any experience medical supply but can give you an example of manufacturing sector like sharpening tool, feeding oil, start up/ warm up time etc. so that you will get net available time for operation.

i will suggest you to gor for work sampling or stopwatch study. though this is cumbersome but it will give you a grip of TIME & MOTION STUDY.

later on you can go for PMTS for improvement in process.

also please keep in mind the nature & skill level of the person.
Reply With Quote
  #4 (permalink)  
Old 04-30-2008, 09:09 AM
Puneeta Puneeta is offline
Member
 
Join Date: Apr 2008
Posts: 9
Default

You seem to be on the right track, Sir !
Reply With Quote
  #5 (permalink)  
Old 04-30-2008, 09:13 AM
Puneeta Puneeta is offline
Member
 
Join Date: Apr 2008
Posts: 9
Default

I shall try my best to stick by your suggestions, Sir.
Reply With Quote
  #6 (permalink)  
Old 04-30-2008, 09:20 AM
Puneeta Puneeta is offline
Member
 
Join Date: Apr 2008
Posts: 9
Default

Thankyou. For now I could not follow much from your response though I do find it valuable some way. Shall be happy to keep on receiving any more posts from you on that note.
Reply With Quote
  #7 (permalink)  
Old 04-30-2008, 09:22 AM
Puneeta Puneeta is offline
Member
 
Join Date: Apr 2008
Posts: 9
Default

....Sir. (sorry for the misgiving),
Reply With Quote
  #8 (permalink)  
Old 04-30-2008, 09:47 AM
Puneeta Puneeta is offline
Member
 
Join Date: Apr 2008
Posts: 9
Default

hey this looks pretty , wow !!!
Reply With Quote
  #9 (permalink)  
Old 04-30-2008, 09:47 AM
Puneeta Puneeta is offline
Member
 
Join Date: Apr 2008
Posts: 9
Default

........ :cool :
Reply With Quote
  #10 (permalink)  
Old 04-30-2008, 10:02 AM
Puneeta Puneeta is offline
Member
 
Join Date: Apr 2008
Posts: 9
Default

Thanks for ur company.Sir.
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is Off
Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -4. The time now is 12:44 PM.



Content Relevant URLs by vBSEO 3.0.0