![]() |
|
|||||||
| Traditional IE Techniques Work Station Design, Layout Optimization, Total Quality Management, Statistical Process Control, Control Charts |
![]() |
|
|
LinkBack | Thread Tools | Search this Thread | Display Modes |
|
|||
|
Hi i m ajmal plz send me some type of forms for work measurement & metod study. i want to implement it in inspection department of Denim manufacturing factory. Waiting ur immidiate responce.
Thanks & Regards: Ajmal Raees |
|
|||
|
There are several predetermined time study systems available for use that work pretty well. MTM is good but I like MOST better. If your consistent, it works well. A good book on it is called MOST Work Measurement Systems, author Kjell B. Zandin. Of course, there is always the stopwatch.
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|