PMC Forums  

Go Back   PMC Forums > Simulation > Simulation Analysis
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Simulation Analysis simulation software (Arena, AutoMod, Enterprise Dynamics, ProModel, SIMUL8, WITNESS), input and output analysis, experimental design, optimization, simulation model verification and validation

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 07-20-2007, 10:46 AM
rwilcox rwilcox is offline
Member
 
Join Date: Jun 2007
Posts: 28
Default Resources in WITNESS

What are some of the general purposes of using Resources in WITNESS?
Reply With Quote
  #2 (permalink)  
Old 08-09-2007, 05:09 PM
ewilliams ewilliams is offline
Moderator
 
Join Date: May 2007
Location: Detroit area, Michigan, U.S.A.
Posts: 50
Send a message via Skype™ to ewilliams
Default

Resources are often used to operate machines (e.g. a manual or semi-automatic machine, versus a fully automatic one) or to repair machines. Even if a machine does not need a resource to cycle, it can be specified as needing a resource to repair it when it breaks down. Resources are called "Labor" in WITNESS.
__________________
E. Williams, PMC
Reply With Quote
  #3 (permalink)  
Old 08-09-2007, 05:36 PM
rbuchelli rbuchelli is offline
Member
 
Join Date: Aug 2007
Posts: 2
Talking Witness Simulation Modeling



I have always considered a machine to be a resource as well. How do you account for machines in Witness?


rbuchelli
Reply With Quote
  #4 (permalink)  
Old 08-10-2007, 09:39 AM
ewilliams ewilliams is offline
Moderator
 
Join Date: May 2007
Location: Detroit area, Michigan, U.S.A.
Posts: 50
Send a message via Skype™ to ewilliams
Default The concept of "MACHINE" in WITNESS

A machine in the general sense is also a "Machine" in WITNESS. A WITNESS Machine could represent a lathe in a factory, a packaging machine in a warehouse, an ATM in a bank, a check-in kiosk in an airport, or the scales at a highway truck weighing station. A WITNESS Machine is typically immobile (whereas a Resource is moveable) and dedicated to its one task.
__________________
E. Williams, PMC
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is Off
Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -4. The time now is 12:25 PM.



Content Relevant URLs by vBSEO 3.0.0