PMC Forums  

Go Back   PMC Forums > Simulation > Simulation Analysis
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Simulation Analysis simulation software (Arena, AutoMod, Enterprise Dynamics, ExtendSim, PlantSim, ProModel, SIMUL8, WITNESS), input and output analysis, experimental design, optimization, simulation model verification and validation

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 06-27-2011, 11:03 AM
Jack22 Jack22 is offline
Member
 
Join Date: May 2011
Posts: 14
Question Machine working in serie (tunnel) VS single Machine

I have to modelize the process as dscribed below :

4 machines 2 different kinds but same work. Cleaning take 75 minutes in model 1 and 65 in model 2. The model 2 can accept one load after one. The machine 1 can accept one load every 25 minutes (3 charges maximum in the tunnel).

For now I have add 4 machines in one set. The set is linked to the "process". The capacity of the model 2 is 3 times the capacity of model 1. I wanted to know, how can I add an attributes to all the entity proceeded by the model 2 ? Therefore I could use a "decide module" to separate entites procedeed by Model 2 and delay them for the 40mn missing in the process for now.

Or do you have any idea how to modelise this machine ? The difficulty after will be to generate statistic to compare the 2 models.… Any ideas ?
Reply With Quote
  #2 (permalink)  
Old 09-25-2011, 09:53 PM
qrst579 qrst579 is offline
Banned
 
Join Date: Sep 2011
Posts: 12
Arrow occasion backward

occasion backward [url=http://www.ugamegold.com]wow gold[/url] There's zero more to [url=http://www.wowgold361.com]buy wow gold[/url] say." I gaped. "There's [url=http://www.goldinstore.com]buy wow gold[/url] everything author to say! You [url=http://www.goldmvp.com]cheap wow gold[/url] harbor't said anything yet!" He walked [url=http://www.runescape.com]rs gold[/url] historical me, striding endorse .
Reply With Quote
  #3 (permalink)  
Old 11-22-2011, 06:51 AM
samathapetrik samathapetrik is offline
Member
 
Join Date: Oct 2011
Posts: 18
Default

the processes that is quite often seems that in tunnel the specification of the components parts are synchronize and parallel rotation should be going through it make standards characteristics which involves near around the ISO standards,BIS standards,API standards,IEC standards,british standards,JIS standards etc and in single machine tuning it is different aspect rather than this to deliver the Sandinista of this .
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is Off
Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On




All times are GMT -4. The time now is 09:07 AM.



Content Relevant URLs by vBSEO 3.0.0