![]() |
|
|||||||
| Manufacturing Simulation job shop, flow shop, and assembly line simulation, plus resource utilization, manufacuting efficiency, queuing analysis, implementing kanban |
![]() |
|
|
LinkBack | Thread Tools | Search this Thread | Display Modes |
|
|||
|
Hi everyone,
I am simulating a single machine facility with multiple products and would like to model set ups which are necessary every time before a different type of product enters the ressource with its specific amount of order. I appreciate your suggestions. Hamed |
|
|||
|
Greetings. What software package are you using? Arena, SIMUL8, WITNESS, ProModel, etc. all have slightly different ways of modeling this situation; all can do it. Interestingly, this situation arises in health care facility simulation too: e.g., the technician at an X-ray machine may need setup time if patient #1 needs a chest X-ray and patient #2 needs an ankle, possibly broken, X-rayed.
__________________
E. Williams, PMC |
|
|||
|
thoughts-I see [url=http://www.ugamegold.com]wow gold[/url] what that feels like… "Who [url=http://www.wowgold361.com]buy wow gold[/url] wants to be a nightmare, a [url=http://www.goldinstore.com]buy wow gold[/url] monster? "And then, the way [url=http://www.goldmvp.com]cheap wow gold[/url] it comes so easily to me, the way [url=http://www.runescape.com]rs gold[/url] I'm turn at it than the ease of .
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|