Resources are often used to operate machines (e.g. a manual or semi-automatic machine, versus a fully automatic one) or to repair machines. Even if a machine does not need a resource to cycle, it can be specified as needing a resource to repair it when it breaks down. Resources are called "Labor" in WITNESS.