View Single Post
  #3 (permalink)  
Old 07-26-2007, 12:37 PM
Wolverine Wolverine is offline
Member
 
Join Date: Jul 2007
Posts: 3
Default

Here is my take on that:

Factors to be considered:
• Span of model
- Factory level planning and control operations.
- Individual manufacturing cell model.
• Accuracy requirements
- Accurate throughput estimate is required.
- Compare two systems - which one gives more
output.
• Variables and policies of interest in the study
Macromodel
-- Inventory control policies
-- Scheduling policies
-- Buffer inventories
-- Part batch sizes
-- Model changeover strategies
Micromodel
-- Number of machines
-- Labor requirements
-- Layout of manufacturing cells
-- Material handling equipment requirements

Hope this helps.
Reply With Quote